DigiPuls
Practice space — nothing here is saved.
Self-assessment summary — DigiPuls

Self-assessment summary

Model Lyceum (practice school)

Cycle 2 · Confirmed 9/20/2026 · Published to public view

Instrument: Annex A v3 · Equipment rules: Order 675/2024, Annexes 2 and 5

The school’s digital profile012345A1 — Participatory strategic planning: Level 3A2 — Data-informed decision making: Level 2A3 — Learning organisation and knowledge sharing: Level 3A4 — Monitoring and evaluation: Level 1A5 — Leadership support and motivation: Level 2B1 — Integrated STEAM / interdisciplinary project-based learning: Level 3B2 — Changing teacher and student roles: Level 2B3 — Learner-centred assessment: Level 2B4 — Structural changes in curriculum, scheduling, and learning spaces: Level 3B5 — Pedagogical use of digital resources and AI tools in teaching and learning: Level 1C1 — Teachers’ digital competence: Level 2C2 — Learners’ digital competence: Level 2C3 — Structured professional development, mentoring and coaching capacity: not rated yetC4 — AI literacy and emerging-technology competence: not rated yetD1 — Network and digital security: Level 1D2 — Digital devices: Level 1D3 — IT management: Level 2D4 — User support: Level 0D5 — Software, digital services, and information systems: not rated yetA1A2A3A4A5B1B2B3B4B5C1C2C3C4D1D2D3D4D5A — LeadershipB — TeachingC — Human capacityD — Infrastructure

Domains at a glance

Domain Average level Rated
A — Leadership, Governance and Change Management · strongest 2.2 5/5
B — Teaching, Learning and Assessment · strongest 2.2 5/5
C — Human Capacity and Digital Competence 2.0 2/4
D — Infrastructure, Platforms and Digital Ecosystem · weakest 1.0 4/5

Domain A — Leadership, Governance and Change Management

Indicator Level Evidence
A1 — Participatory strategic planning 3 — Process redesign
Grew
  • Document / policy: Development strategy 2026–2030, approved by the pedagogical council — Minutes no. 4 / 12.09.2026 (added by Elena Guriță, 9/10/2026)
A2 — Data-informed decision making 2 — Initial coordination
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
A3 — Learning organisation and knowledge sharing 3 — Process redesign
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
A4 — Monitoring and evaluation 1 — Accidental
Grew
—
A5 — Leadership support and motivation 2 — Initial coordination
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)

Domain B — Teaching, Learning and Assessment

Indicator Level Evidence
B1 — Integrated STEAM / interdisciplinary project-based learning 3 — Process redesign
  • Document / policy: Lesson observation records from the autumn term — Head teacher’s file (added by Elena Guriță, 9/10/2026)
B2 — Changing teacher and student roles 2 — Initial coordination
Grew
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
B3 — Learner-centred assessment 2 — Initial coordination
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
B4 — Structural changes in curriculum, scheduling, and learning spaces 3 — Process redesign
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
B5 — Pedagogical use of digital resources and AI tools in teaching and learning 1 — Accidental
Grew
—

Domain C — Human Capacity and Digital Competence

Indicator Level Evidence
C1 — Teachers’ digital competence 2 — Initial coordination
  • Document / policy: Attendance list from the February in-house training — Training register (added by Elena Guriță, 9/10/2026)
C2 — Learners’ digital competence 2 — Initial coordination
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
C3 — Structured professional development, mentoring and coaching capacity — —
C4 — AI literacy and emerging-technology competence — —

Domain D — Infrastructure, Platforms and Digital Ecosystem

Indicator Level Evidence
D1 — Network and digital security 1 — Accidental —
D2 — Digital devices 1 — Accidental
Grew
—
D3 — IT management 2 — Initial coordination
  • Meeting minutes: Recorded in the team’s working notes (added by Ana Novic, 9/12/2026)
D4 — User support 0 — Below floor —
D5 — Software, digital services, and information systems — —

Order 675/2024 — minimum equipment

D1 — Network checklist: NON-COMPLIANT (≥2–3 separated, password-protected subnets (administration/teachers, students, guest); Content filtering for the student network)

D2 — Order 675 quantitative equipment check: NON-COMPLIANT (Classroom PCs/laptops (≥50% of classrooms equipped): 7/12; Interactive panels (1 per equipped classroom): 6/12; IT-room PCs (3 room(s) × 15): 14/45; Methodical-centre PCs/laptops: 2/3)

Generated by DigiPuls. This is a browser print-to-PDF export; a server-side PDF renderer is a natural next step (see README.md, "Not yet built").